CONSALTING

  • 2017.
    • Spervision of the replacement of two existing step-up transformers located in Markabi Power Plant, with two new transformers, replacement of cables and protection systems, Lebanon. Client: MML Middle East Ltd Dubai.
    • Consultancy Services of DEWA approved transformer specialist engineer to witness the Repeat Factory Acceptance Test (FAT) of one 50MVA 132/11kV transformer of 132/11kV Barhi substation in Dubai at the works of the manufacturer M/s BEST in Turkey. Client: MML Middle East Ltd Dubai.
    • Engineering and technical consultancy services : Preparation of pre-commissioning and commissioning schedule, its Implementation, monitoring of the pre-commissioning at client’s premises. Preparation of Master Test Plan and the Site Acceptance Test Plan (test sheets & procedures, performing the work risk analysis for pre-commissioning and commissioning activities. Client: IMES Engineering & Contracting Ltd, UK.
    • Supervision of the replacement of two existing step-up transformers located in Markabi Power Plant, with two new transformers, replacement of cables and protection systems, Lebanon.
  • 2016.
    • Supervision of the reconstruction of the 110kV switchgear, replacement of the protection and control systems and auxiliary supply and integration into the existing SCADA system in 110/35kV substation "TO Novi Beograd", Serbia.
    • Preparation of Feasibility study including preliminary design (PD) and Environmental and social impact assessment (ESIa) for developing the optimal 400kV OHL interconnection between SS Bajina Basta and SS Kraljevo, together with the potential upgrade/dismantling/replacement of the existing 220kV equipment and including the OHL terminations in the respective substations, Serbia.
  • 2015.
    • Preparation of Feasibility study including preliminary design (PD) and Environmental and social impact assessment (ESIA) for developing the optimal 110kV OHL interconnection between SS Vilusi and SS Herceg Novi, together with the development of Brezna 400kV SS, Montenegro.
  • 2013.
    • Preparation of Feasibility study including preliminary design (PD) and Environmental and social impact assessment (ESIA) for the construction of new OHL line between SS Elbasan 1 / SS Fieri, with transformation in Kucova, Albania.

PROJECT DESIGN

  • 2017.
    • Preparation of the circuit and wiring diagrams and construction drawings for all panels for the SS 110/10kV Beograd 23, Serbia (2017.)
    • Preparation of the Basic solutions, Basic design, Main telecommunication project and Construction drawings for the SS Možura 110/30kV, Montenegro (2017.)
  • 2016.
    • Complete technical documentation for the construction of 110/35/10kV GIS SS “Kopaonik” (electrical and civil part), Serbia (2016.)
    • Primary Project design - Line traps removal 400 kV: Lovedean-Mannington-Nursling, United Kingdom (2016.)
    • Primary Project design - Line traps removal 275kV: West Boldon-Hartlepool, United Kingdom (2016.)
    • Site supervision of the reconstruction of the SS 110/35kV TO “Novi Beograd”, Serbia (2016./17.)
    • Project for reconstruction of the SS 110/35kV TO “Novi Beograd”, Serbia (2016./17.)
    • Preparation of 3D representation for the airport “Nikola Tesla”, Serbia (2016./17.)
  • 2015.
    • Secondary Project design – preparation of wiring diagrams for the “Drakellow” bay, SS Oldbury, United Kingdom
    • Primary Project design –preparation of drawings for the SS “Pentir-Wilfa”, United Kingdom
    • Project documentation for the replacement of the primary equipment in the SS 110/35/10kV “Beograd 1”, Serbia
    • Primary Project design, general arrangement and elevation drawings for the SS “Muaithebheal”, United Kingdom
    • Project for reconstruction of the control panel of the regulation transformer 110/35kV in the „Potpeć“ Hydro power plant, Serbia
    • Detailed design for 35kV cable construction and its interconnection between SSs: 110/35kV Pirot II – SS 35/10kV and Tigar and SS 35/10kV Tigar – SS 35/10kV Pirot 4, Serbia
    • Preparation of studies – feasibility study, environmental protection study, insulation coordination study for the SS 110/35/10kV Kopaonik, Serbia
  • 2014.
    • Preparation of wiring diagrams and construction drawings for all panels in 110/10kV substation “Belgrade 41”, Belgrade
    • Project design – preparation and modification of wiring diagrams for SS Fort Augustus 132kV, United Kingdom
    • Project design – interface engineering for replacement of the GT1 ad GT2 transformers in the SS Johnston 132kV, United Kingdom
    • Project design – interface engineering for replacement of the GT1 ad GT2 transformers in the SS Maybole 132kV, United Kingdom
    • Primary Project design for SS Fort Augustus i SS Strichen, United Kingdom
    • Technical control of the Main project for the substation 35/10kV Dudovica, Serbia
    • Basic and Main project design of the 35/10kV substation “Tigar”, with the 35kV cable connection network, Serbia
    • Technical control of the Main project for OHL bays No. 13 and No.16 110kV “FAS Kragujevac” in “Kragujevac 2”, Serbia
    • Primary Project design for the SS Muithebel, United Kingdom
    • Primary Project design for the Raheenleagh WF MV Cable Collector, United Kingdom
    • Primary Project design for the Sallachi substation, United Kingdom
    • Technical control of the Main project for the replacement of the distant protection in the 110kV ring in PK “Drmno” and for the installation of the primary equipment in OHL bay 110kV, Serbia
  • 2013.
    • Project design – preparation of the disposition and elevation drawings for the SS Barking, United Kingdom
    • Project design – preparation of the disposition and elevation drawings, civil and specialist guide for the project MSCDN DDD “Longanet”, V. Britanija
    • Project design – preparation of the disposition and elevation drawings, civil and specialist guide for the project MSCDN DDD Moffat, United Kingdom
    • Project design – preparation of overall layout, CDM, GIS access and support requirements for the Willesden DDD project, United Kingdom
    • Project for the implementation of the new protection in the East Claydon/Sundon bay in the SS Leighton Buzzard, United Kingdom
    • Project design – preparation of the disposition and elevation drawings for the SS Padiham, United Kingdom
    • Project design – preparation of the disposition and elevation drawings for the SS Bredford West, United Kingdom
    • Technical control of the Main project: Košava windpark, Construction of the 110kV switchgear for the Kosava windpark, Construction of the 35kV switchgear and 35/110kV substation for the Kosava windpark, Serbia
    • Project design for the bays: MC8/Dungeness 2, MC6/Dungeness 1, SS Sellindge, United Kingdom
    • Project design – preparation of the disposition and elevation drawings for the SS Canterbury North United Kingdom
    • Project design - preparation of the disposition and elevation drawings for the SS Dyce, United Kingdom
    • Project design - preparation of ciruit diagrams for the shunt reactor, “busbar” and “feeder” panels for the SS Windyhill, United Kingdom
    • Technical control of the Main project for replacement of the 20kV cable network between the substation,s in the „HIP Petrohemija Pančevo” factory, Serbia
    • Main project design of the 33/110kV substation for the “Krnovo” windpark and of the 110/33kV substation “Brezna”, Montenegro
  • 2012.
    • Project documentation - basic design for the SS 110/20kV and the internal 20kV cable network system for the wind park “Kladovo”- Stage 1
    • Project design – revision of overall layout and stage-by-stage drawings, CDM drawing and elevations drawings for the “Iver” project, United Kingdom
    • Project design – secondary design for the 33/11kV substation “Chessingtom Data Centre”, United Kingdom
  • 2011.
    • Project design – preparation of the wiring diagrams for the SGT2 and Mesh corner bays, SS Spennymoore, United Kingdom
    • Project design – drawings modification for the “Daines 2” bay, project “Deeside strategic asset upgrade”, United Kingdom
    • Preliminary design for the 110/35kV SS for the Wind Farm “Košava”, Serbia
    • Project design – GIS SS Connahs Quay, United Kingdom
    • Project design – Control System Replacement in the Seabank substation, United Kingdom
    • Complete (primary & secondary) design for the “Pancevo Oil Rafinery’s 220/6kV (GIS) SS, Serbia
    • Project design – project SS “Cowley”, Didcot bay, United Kingdom
    • Project design – CDM drawings for the project Brimsdown, United Kingdom
    • Project design – wiring diagrams for Alness/Besuley/Shin intertrip panels, United Kingdom
    • Project design – wiring diagrams for the SS Connahs Quay, Legacy and Trawsfynd bays, United Kingdom
    • Project design –preparation of the circuit and wiring diagrams for the SGT4 bay, SS Seabank, United Kingdom
    • Project design – wiring diagrams for the SS Connahs Quay, “Legacy” bay and cable project “Trawsfynd”, United Kingdom
  • 2010.
    • Project documentation– Les Mandarins, United Kingdom
    • Project documentation– West Ham T/S, United Kingdom
    • Project documentation– Aberthaw T/S, United Kingdom
    • Project documentation– Grain T/S, United Kingdom
    • Project documentation– Coweley T/S, United Kingdom
    • Project documentation– Uskmouth T/S, United Kingdom
    • Project documentation– Spennymore SS, United Kingdom
    • Project documentation– East Coast operational intertrip scheme, United Kingdom
    • Project documentation– design, FAT, commissioning and site testing of 132/33kV SS Galu 132/33kV and SS 275/133kV Rabai, Kenya
    • Project documentation– Patford bridge SS, United Kingdom
    • Project documentation– Enderby SS , United Kingdom
    • Project documentation– drawings modification for the project “Khalda”, Egypt
    • Project documentation– Spennymore SS, bays: Howthorn Pit & Norton, United Kingdom
    • Project documentation– “As build” drawings for the SS Sundon, United Kingdom
    • Project documentation– modification of CAD drawings for the Melksham bay in the SS Seabank, United Kingdom
    • Project documentation– “As build” drawings for the SGT1, SS East Claydon, United Kingdom
    • Project documentation– preparation of wiring diagrams for the SGT2, SS Patford bridge, United Kingdom
    • Project documentation– preparation of drawings for the Reserve Bus Section, SS Barking, United Kingdom
    • Project documentation– “As build” drawings for the Uskmouth 2 bay in the SS Whitson, United Kingdom
    • Project documentation– “As build” drawings for the SS East Claydon, United Kingdom
    • Project documentation– preparation of drawings for “Norton 1” bay in the SS Spennymoore (Stage one), United Kingdom
    • Project documentation– preparation of cable schedules for the SS Spennymoore, United Kingdom
    • Project documentation– preparation of wiring diagrams for the SS Grain, United Kingdom
    • Project documentation– preparation of wiring diagrams for the” Stella West 1” bay, SS Spennymoore, United Kingdom
  • 2009.
    • Project documentation for replacement of protection in the SS 400kV Barking (United Kingdom), “Northfleet East/West Thurrock 1” bay– preparation of circuit and wiring diagrams and cable schedules
    • Project documentation for the SS East Claydon: “As build” drawings for the bus-coupler.
    • Project documentation– preparation of wiring diagrams for the Main Bus Section, SS Barking, United Kingdom
    • Project documentation – modification of drawings for the bays: Aberthaw & Busbar protection, SS Tremorfa, United Kingdom
    • Project documentation– “As build” drawings for the “West Thurrock/Northfleet East 1” bay, SS Barking, United Kingdom
    • Project documentation: preparation of circuit and wiring diagrams for the bays: SGT5 and SGT6, for the SS Barking, United Kingdom
    • Project documentation: drawings modification for the Cardiff East/Uskmouth bay in the SS Whitston, United Kingdom
    • Project documentation: “As build” drawings for the SS Cowley, United Kingdom
    • Project documentation– SS Sundon – “Grendon 2” bay, United Kingdom
    • Project documentation– SS Grendon, “Sundon 2” bay, United Kingdom
    • Project documentation– SS Tremorfa, United Kingdom
  • 2008.
    • Project design for SSs Chirton Grange & Fossway, United Kingdom
    • Project design for reconstruction of various SSs for Mitsubishi Ltd & Siemens Ltd, United Kingdom
    • Project design - “As build” drawings for the 275kV bays: Amersham/Iver2 for the SS East Claydon , United Kingdom
    • Project design – wiring diagrams for the 275kV bays: SGT1/Uskmouth1 and SGT2/Uskmouth2, SS Whitson, United Kingdom
    • Project design – preparation of circuit and wiring diagrams for the 400kV SSs: Canterbury & Kemsley, United Kingdom
    • Project design – preparation of circuit and wiring diagrams for the 400kV OHL bay “Patford Bridge/Enderbery” from the SS East Claydon, United Kingdom
    • Project design - “As build” drawings for replacement of the SCS in the SS 275/33kV Cockenzie, United Kingdom
  • 2007.
    • Project design – preparation of circuit and wiring diagrams for the SSs: Cockenzy, Cowbridge, Ryehouse, Strathaven, United Kingdom
    • Project design – preparation of circuit and wiring diagrams for the Scottish Power SS, United Kingdom
    • Project design – preparation of circuit and wiring diagrams for the SSs EAST CLAYDON, United Kingdom

TESTING AND COMMISSIONING

  • 2016 - 2017.
    • “Loch Buidhe” 275kV S/S - Site Acceptance Testing and overall commissioning, United Kingdom
    • 400kV and 220kV Harmonic Filters commissioning - Walney Onshore Extension Substation, United Kingdom
    • Commissioning of new 132kV Grudie Bridge SS. Two 132/33 GTs, two 33/11kV transformers, protection panels, 33kV GIS board, LVAC board, RTU panels, auxiliary transformers, Fault recorder panel and intertripping panel. Control System Functionality, United Kingdom
    • Testing of two Generator protection units, GE G60, in West Burton power plant, United Kingdom
    • PRE-FAT & FAT testing of protection panels for Grudie Bridge SS 132/33/11kV, United Kingdom
    • Functional testing of the 132kV GIS switchgear and LCC. Tees Valley 2 project, Air products – Middlesbrough, United Kingdom
    • Configuration of Micom P747 Busbar protection relay. Wishaw 400kV Substation, United Kingdom
    • Configuration and testing of Viewpoint Monitoring - control & monitoring software for a load shedding scheme on the channel islands UK. Project includes 17 Substations with GE C30 control relays. United Kingdom
    • FAT testing of Protection and Control system on Martin Linge 100kV offshore substation. United Kingdom
    • 132/33kV Grid Transformer replacement and new Intertripping scheme installation (GE UR Relays). Strichen, ST Fergus and Fraserburgh Substations – Scotland, United Kingdom
    • NICAP “High Marnham - Thurcroft – West Melton” 275kV feeder - Factory Acceptance Testing performing, United Kingdom
    • NICAP “Cowley - Leighton Buzzard - Sundon” 400kV feeder - Factory Acceptance Testing performing , United Kingdom
    • “Western Link” Hunterston HVDC Converter Station - Site Acceptance Testing and overall commissioning, United Kingdom
    • NICAP “Kitwell – Ocker Hill” 275kV feeder - Factory Acceptance Testing, United Kingdom
    • NICAP Mesh Corner Protection - Type Registration Testing, United Kingdom
    • NICAP “Hartlepool – West Boldon” 275kV feeder - Factory Acceptance Testing performing, United Kingdom
    • NICAP “Lovedean - Mannington - Nursling” 400kV feeder - Factory Acceptance Testing performing, United Kingdom
    • NICAP Mesh Circuit Breaker Unit with Ferroresonance Detection & Suppression - Type Registration Testing; United Kingdom
    • NICAP 3-Ended HV Feeder Bay Protection - Type Registration Testing, United Kingdom
    • “Thanet” Windfarm Operational Tripping Scheme - Site Acceptance Testing, United Kingdom
    • NICAP “Exeter – Taunton 1” 400kV feeder - Factory Acceptance Testing, United Kingdom
    • NICAP “Eggborough – Monk Fryston 1” 400kV feeder - Factory Acceptance Testing , United Kingdom
    • NICAP “Pentir – Wylfa 1” 400kV feeder - Factory Acceptance Testing , United Kingdom;
    • “Thanet” Windfarm Operational Tripping Scheme - Factory Acceptance Testing, United Kingdom
    • NICAP “Kirkby” 275 kV S/S, SGT4A & SGT3B LV Transformer feeder - Factory Acceptance Testing, United Kingdom
    • Testing and commissioning of the SS 132/33kV Dudgeon OSP (UK) “Offshore” wind park platform
    • Testing and commissioning of the SS 100kV Martin Linge, Offshore substation for the oil platforms supply,South Korea
    • Testing of protection devices and primary equipment in the Belgrade Water and Sewage Co’s substations, Serbia
    • Maintenance of the protection devices in the NIS “Oil Refinery Pancevo”(GE T60 relays)
    • Maintenance of the protection devices in the Hesteel (Serbia) - GE Multilin 469 relays
  • 2015.
    • Western Link” Flintshire Bridge HVDC konvertorska stanica – SAT testiranje i celokupno ispitivanje
    • TS 100kV Martin Linge Offshore (Velika Britanija) – FAT testiranje Siemens relejne zaštite (Manchester ,Velika Britanija)
    • SIPS projekat, ostrvo Jersey (Velika Britanija) – Ispitivanje sistema daljinske komande grupe TS
    • “Beogradske Elektrane“ (Srbija) – Redovan godišnji servis GE frekventnih regulatora i soft startera (periodicno od 2010. – 2017.)
  • 2014.
    • TS 400/220/132kV Elstree, ispitivanje i puštanje u rad zaštitnih releja Siprotec (7SD, 7UT, 7SA i 7SJ serije)
    • TS 132kV Strichen (Velika Britanija) – Ispitivanja transformatora i relejna zaštite posle rekonstrukcije
    • Gwynt Y Mor Offshore Windfarm (Velika Britanija) – SAT testiranje i pustanje u rad relejne zaštite, sopstvenog napajanja i primarne opreme na vetrogeneratorima (Camel Laird, Velika Britanija)
    • TS 11kV “Astra Zeneca“ (Velika Britanija) – Ispitivanje primarne opreme posle rekonstrukcije (Macclesfild, Velika Britanija)
    • TS 132kV “Limburner Line“ (Velika Britanija) – Ispitivanje GIS primarne opreme (London, Velika Britanija)
    • Dalekovod 275kV “Iron Acton – Melksham 2” (Velika Britanija) ) – FAT testiranje tipskog resenja zaštite (NICAP) za National Grid (Gainsborough,Velika Britanija)
    • Dalekovod 275kV “Bradford West – Kirkstall” (Velika Britanija) ) – FAT testiranje tipskog resenja zaštite (NICAP) za National Grid (Gainsborough,Velika Britanija)
    • Dalekovod 400kV “Drakelow – Oldbury” (Velika Britanija) ) – FAT testiranje tipskog resenja zaštite (NICAP) za National Grid (Gainsborough,Velika Britanija)
    • Walney Onshore Windfarm TS 132kV (Velika Britanija) – Ispitivanje Filtera (Walney, Velika Britanija)
    • Registracija tipskog resenja zastite (NICAP) niskonaponskog transformatorskog izvoda za National Grid – FAT testiranje (Hebburn, Velika Britanija)
    • TS 275kV “Kirkby“ SGT4A & SGT3B (Velika Britanija) – FAT testiranje tipskog resenja zaštite (NICAP) za National Grid (Hebburn, Velika Britanija)
    • Thanet Offshore Windfarm (Velika Britanija) – FAT testiranje Operational Intertrip Scheme (Manchester, Velika Britanija)
    • Thanet Offshore Windfarm (Velika Britanija) – SAT testiranje Operational Intertrip Scheme (Ramsgate, Velika Britanija)
  • 2013.
    • Registracija tipskog resenja zastite (NICAP) visokonaponskog voda za National Grid – FAT testiranje (Gainsborough, Velika Britanija)
    • TS 400kV “Heysham“ (Velika Britanija) – Ispitivanje trafostanice nakon rekonstrukcije
    • TS 132kV “Githambo” (Kenija) – SAT testiranje GE zastitnih releja (Githambo, Kenija)
    • TS 400kV Hedon (Velika Britanija) – Izrada projekta izvedenog stanja TS
    • Dalekovod 400kV “Bradford West – Padiham” (Velika Britanija) – FAT testiranje tipskog resenja zaštite (NICAP) za National Grid (Gainsborough,Velika Britanija)
    • Dalekovod 275kV “Bradford West – Monk Fryston” (Velika Britanija) ) – FAT testiranje tipskog resenja zaštite (NICAP) za National Grid (Gainsborough,Velika Britanija)
    • TS 220kV “Rafinerija Nafte Pančevo“(Srbija) – Kofigurisanje GE UR T60 releja i testiranje IEC 61850 SCADA implementacije
  • 2012.
    • TS 110kV“Vrla 2” (Surdulica, Srbija) – SAT testiranje relejne zaštite sa sistemima automatskog upravljanja
    • Gwynt Y Mor Offshore Windfarm TS 132kV platforme (Velika Britanija) – FAT testiranje Siemens relejne zastite, GIS postrojenja I SCADA sistema (Belfast, Velika Britanija)
    • Gwynt Y Mor Offshore Windfarm TS 400kV “St Asaph” (Velika Britanija) – SAT testiranje Siemens relejne zastite, GIS postrojenja, Transformatora, Filterskog postrojenja I SCADA sistema
  • 2011.
    • London Array Offshore Windfarm TS 150kV platforme (Velika Britanija) – FAT testiranje Siemens zaštite (Antwerp, Belgija)
    • London Array Offshore Windfarm TS 400kV “Cleve Hill” (Velika Britanija) – SAT testiranje Siemens zastitnih releja, GIS postrojenja, Transformatora, Filterskog postrojenja i SCADA sistema (Graveney, Velika Britanija)
  • 2010.
    • Industrijsko postrojenje “Fresh & Co” (Srbija) – Pregled gromobranske instalacije i izdavanje strucnog nalaza
    • TS 132kV “Galu” i TS 132kV “Rabai” (Kenija) – SAT testiranje GE zastitnih releja (Mombasa, Kenija)
    • TS132kV “Mangu” i “Githambo” (Kenija) – Konfigurisanje GE zastitnih releja
    • TS132kV “Mangu” i “Githambo” (Kenija) – FAT testiranje GE zastitnih releja (Jarrow, Velika Britanija)
  • 2009.
    • TS 60kV “Beni Ounif” (Alžir) – Konfiguracija GE SCADA sistema
    • TS 60kV “Birghbalou” (Alžir) – Konfiguracija GE SCADA sistema
    • TS 132kV “Galu” i TS 132kV “Rabai” (Kenija) – Konfigurisanje GE zastitnih releja
    • TS 60kV “Beni Ounif” (Alžir) – FAT testiranje SCADA sistema (Sarajevo, BiH)
    • Ispitivanja za projekat Strathaven u Velikoj Britaniji
  • 2008.
    • Projekat “West Coast 400kV Operational Intertrip Scheme Extension” (Scottish Power, Velika Britanija) – Konfigurisanje i testiranje opreme
    • Industrijsko postrojenje “Northern Pipeline Gas Compression” (Egipat) – FAT testiranje GE zastite i SCADA sistema (Nottingham, Velika Britanija)
  • 2007.
    • TS 400kV Cernavoda (Rumunija) – FAT testiranje GE zastite i SCADA sistema (Sheffield, Velika Britanija)